Product Features
How to use cement transfer pump in tunnel engineering?
The application of three cylinders BW250 cement transfer pump in tunnel engineering is mainly reflected in the following aspects:
- Grouting and water blocking technology: In tunnel engineering construction, cement grouting pumps are used for grouting and water blocking to control water inflow and cracks. Grouting materials must have good fluidity, stability, and high compressive strength and impermeability. In actual construction, the grouting materials used are usually ordinary silica cement and water glass. The configuration ratio of the slurry is determined through multiple experiments. For example, the water-cement ratio is 0.8:1, the volume ratio of cement to water glass is 1:0.4, and disodium hydrogen phosphate is added as a retarder.
- Grouting system selection: The BW250 cement transfer pump used in construction includes full hydraulic drilling rigs, grouting pumps, mixers and high-pressure hoses. The double-tube grouting method is mainly used. After the cement slurry and water glass are mixed and stirred at the orifice, they are injected into the pipe at high pressure to allow the slurry to enter the cracks, fill the gaps after solidification, and prevent water leakage.
- Tunnel reinforcement treatment: Cement grouting technology is widely used in tunnel reinforcement treatment because of its simple, fast and effective characteristics. Especially in the construction of shallow buried and soft surrounding rock tunnels and the treatment of tunnel collapse, the three methods of ground grouting, tunnel working surface grouting, and tunnel periphery shallow hole grouting are combined to ensure construction safety.
- Surface grouting: insert a grouting conduit around the surface collapse, and start grouting according to the predetermined water-cement ratio and grouting pressure to consolidate the surface soil and prevent surface water from flowing into the tunnel and increasing the collapse area.
Parameter
|
Model |
BW250 |
|
Cylinder number |
3 |
|
Max. Flow capacity (L/min) |
250 |
| Max. Pressure (Mpa) | 8 |
|
Cylinder diameter (mm) |
80 |
|
Piston stroke (mm) |
100 |
|
Motor power (KW) |
15 |
|
Input speed (r/min) |
500 |
|
Size of suction pipe (mm) |
64 |
|
Size of slurry discharge pipe (mm) |
32 |
|
Outward Dimensions (L*W*H) (mm) |
1700×995×950 |
|
Weight( Kg) |
750 |
Application
The application of three cylinders BW250 cement transfer pump in tunnel engineering is multifaceted, including water blocking, reinforcement, plugging, etc. Through different grouting technologies and methods, the construction efficiency and safety of tunnel engineering are effectively improved.
Grouting of working face in tunnel: large pipe shed grouting and I-shaped frame reinforcement support are adopted in the tunnel. Cement slurry is injected into the large pipe shed, and the initial grouting pressure is 0.5~1Mpa and the final pressure is 2Mpa. The principle is to control the cement slurry not to emerge from the surface.
Grouting of shallow holes around the tunnel: In order to prevent the surrounding rock of the plug plate outside the large pipe shed from falling off, grouting steel flower pipes are set for grouting support. Before grouting, concrete is sprayed to seal the face to prevent leakage, and then cement water glass slurry is grouting. The initial grouting pressure is 0.1~0.3Mpa and the final pressure is 0.5Mpa.
Improve construction efficiency and safety: The cement transfer pump improves the construction quality in tunnel engineering with its high efficiency and stability, and greatly shortens the construction period, providing a strong guarantee for the smooth completion of the project. The grouting pump is easy to operate and maintain, which reduces the labor intensity of workers. It is equipped with an intelligent control system that can monitor various parameters in the grouting process in real time to ensure the stability and reliability of the grouting effect.
Industry application: Cement mortar grouting machine is widely used in tunnel excavation and maintenance, road, bridge, dam, mine construction and foundation treatment projects of high-rise buildings and various high-pressure grouting projects, especially in tunnel projects for plugging leaks, construction joints, settlement joints, expansion joints, and pool bottom cracks. Waterproof plugging construction.
Precautions
After the BW250 three cylinders cement transfer pump has been stopped or reinstalled for a long time, the following preparations must be made before starting.
1. Check whether there is enough lubricating oil in each part.
2. Check whether the suction pipe of the filter is unblocked.
3. Check whether there is obstruction in the movement of each part.
4. Check the accuracy and reliability of the transmission mechanism.
5. Check the looseness of fasteners, especially the screw tightening of rubber piston locking nut, cross head and piston rod connection thread.
6. Check the suction height of the grout pump machine. The maximum suction height of the pump should not exceed 2.5 meters in areas below 1000 meters above sea level. In areas above 1000 meters above sea level, the suction height of the pump should be reduced according to the local atmospheric pressure reduction.
7.Check the position of the filter immersed in the mud tank. Generally, the mud level should be below 0.3-0.5 meters, and the filter should be no less than 0.5 meters away from the bottom of the mud tank.
Pictures






Company Information
Brief Introduction
Henan Tytion Machinery Co., Ltd is a professional manufacturer and exporter that is concerned with the design, development and production of engineering machinery, road machinery, bridge and tunnel equipment, mining machinery and other products.
The cement grouting pump, mortar grouting pump, concrete pump, dry/wet type shotcrete machine, mortar plaster machine, as well as various types of mixers, etc. which produced by the company are well received by customers at abroad, and we have been constantly ensuring the steady improvement of product quality.
Our Services
FAQ
Q: How about the quality of machines?
Q: About the delivery time?
Q: As for the warranty?
Q: Which kind of payment is available for us?
Q: How about the service?
Q: What's the price of the cement transfer pump? Is there a discount on your price about this machine?