Application
This series of XPB-90E high pressure cement grouting pump can be used in the following fields:
○ Soft foundation treatment, high-pressure jet grouting;
○ High-pressure water jet assists rock breaking and coal falling;
○ Liquid supply for underground hydraulic props in coal mines;
○ Anchorage uses hydraulically expanded metal paving poles to pump high-pressure water;
○ Desilting and cleaning of large underground pipelines
○ Chemical pumps;
○ High-pressure water jet horizontal through-hole drilling;
○ Pumps for grouting for other purposes
Working medium
The working medium of XPB-90E high pressure cement grouting pump must be filtered through a mesh of more than 20 mesh to filter out harmful solid particles. If there are many solid particles in the medium, the number of filtration times needs to be increased. Common faults caused by poor filtration are as follows:
1) Since the liquid end seal of the mud pump is made of rubber, solid particles are pressed into the rubber by the valve plate under high pressure. If the particles are larger, the valve plate will be cushioned, causing sealing failure and further damaging the valve plate and valve seat.
2) If the particles are small but in large quantity, when accumulated to a certain extent, the valve plate will be cushioned, causing sealing failure and further damaging the valve seat and valve plate.
3) Since the gap between the valve plate and the limit sleeve is small, if larger particles squeeze in, the valve plate can be stuck, causing the pump to work abnormally and damaging the valve plate and valve seat.
4) Users of cement slurry should note: Due to the different cement manufacturers used, the size and quantity of iron beans in the cement are different. Please use an appropriate filter according to the situation to ensure that the high-pressure pump can work normally.
Parameter
| XPB-90E | ||||||
|
Plunger Diameter (mm) |
Motor Power (kw) |
Pressure (Mpa) |
Flow (m³/h) |
Rotation Speed (r/min) |
Stroke (mm) |
Plunger Quantity |
| 60 | 55 | 23 | 8 | 1480 | 80 | 3 |
| 75 | 31 | |||||
| 90 | 37 | |||||
| 75 | 55 | 14 | 12.7 | |||
| 75 | 20 | |||||
| 90 | 24 | |||||
Pictures
Repair and maintenance
1) Frequently check the condition of each sealing component of XPB-90E high pressure cement grouting pump. If there is any water leakage, oil leakage or air leakage, it should be disassembled and repaired immediately, and the damaged seals should be replaced;
2) Regularly check the condition of each moving part to ensure that each lubricating part has sufficient lubricating oil;
※ Warning: Check the lubrication of the box regularly and replace the lubricating oil on time every 6 months!
3) Frequently check whether the fasteners in various parts are loose. Loose bolts will cause damage to machine parts and endanger personal safety;
4) Pay attention to whether there are abnormal noises in the moving parts. If there is any jamming, it should be eliminated in time;
5) Pay attention to check the reliability of the safety valve to ensure reliable overflow in case of overpressure;
6) Ensure the tension of the belt.
Our Services
FAQ
Q: How about the quality of machines?
Q: About the delivery time?
Q: As for the warranty?
Q: Which kind of payment is available for us?
Q: How about the service?
Q: What's the price of the high pressure cement grouting pump? Is there a discount on your price about this machine?




